I want to make a really big space part III

In part II, I explained and illustrated in photographs how we had opened up the kitchen to the family room with a clear sight line through to the living room in a structurally sound manner.

Moving on from the construction phase we are now dry walled and installing oak strip flooring which marry’s into the existing oak floors on the ground level. This is a 3/8 solid naildown floor.

You can also see final wall paint on, crown mouldings and most of the casings.

Advertisements